Colibri Sander BLO 80 2 1 C 30 Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 30
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
ATTENTION
DAILY CHECK BEFORE OPERATING THE SPINDLE
1. For first time installation, look at “Installing the spindle” paragraph.
2. Check air supply (5-6 bar.)
3. Check ventilation exits.
4. Check for free movement of the shaft.
5. The spindle must be securely clamped to the machine and clea
r
from any distraction.
6. Check for electric connections and command (community
grounding).
7. Start the spindle.
6
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 29 30

Comentarios a estos manuales

Sin comentarios