Colibri Sander BLO 80 2 1 C 30 Manual de usuario

Busca en linea o descarga Manual de usuario para De medición, control y control Colibri Sander BLO 80 2 1 C 30. Colibri Sander BLO 80 2 1 C 30 User's Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir

Indice de contenidos

Pagina 1

Manual Book: BLO 80 2.1 C 30

Pagina 2

INSTALLING THE SPINDLE 1. Remove the spindle from its package. 2. Follow the machine’s safety and installation instructions. 3. Clamp the spindle

Pagina 3 - Characteristics

REMOVING THE SPINDLE FROM THE MACHINE Note: Always lift the spindle from the body and not from the shaft. 1. Turn off the spindle. Make sure the

Pagina 4 - CONTENTS

SPECIFICATION FOR HIGH-SPEED AIR SPINDLE Rotation speed – 2K ~ 75K [rpm] Air supply  Pressure :5~7 [bar]

Pagina 5 - . Organizational measures

ELECTRICAL MOTOR SPECIFICATION Size Constants: • Maximum Rated Torque : Tr = 2.13 [Nm] • Maximu

Pagina 6 - Warning of special dangers:

BRUSHLESS DC MOTOR Maximum Continuous Stall Torque (TC) is the amount of torque produce at zero speed, which results in a 100 Cº rise in temperature

Pagina 7 - WARRANTY NOTICE

Torque & Power Vs. Rotation SpeedVsp [Krpm] - Rotation SpeedConditionsT [Nm ] - Spindle Torque1. Temp Rise less then 100° C.Pw [w ]

Pagina 8

Radial Stiffness Vs. Air PressurePs[bar]Sr[N/m]21.52.54.54437.0313.59.134410.956Ps [bar] - Spindle air pressure.4.512.563Sr [N/µ] - Radial Stiffness

Pagina 9

Vsp[Krpm]Vf[Volt] Voltage Constant ( BEMF)59.271018.5415 27.812037.082546.35Vsp [Krpm] - Rotation Speed3055.62Vf [Volt] - Voltage between two p

Pagina 10

The Spindle is mayd from the following materials:Stainless steel: SAE 303, SAE 2316.Brass SAE 40, Copper.Polymers: DelerinBRASS SAE 40 %C0.15 %C0.34

Pagina 11

SPINDLE MODES17-1.25-1-0.75-0.5-0.2500.250.50.7511.250 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220Length[mm]123456

Pagina 13

Why is balancing important?Force (F) generated by unbalance can be calculated from formula:F(Kg)= 0 . 001 x(gmm)x(RPM/ 1000 )2r F(Kg)= 0 . 001 x(w x

Pagina 14

Rigid RotorsMaximum operating speed below 70% of natural frequency or first critical speed.Can be balanced at any speed:Will remain in balance through

Pagina 15 - 0 20406080

ISO Rotor ClassificationsGO.4Spindles, precision grinders, Gyroscopes.G1Small special purpose electrical rotors / drives.G2.5Gas / steam turbines, Tur

Pagina 16 - - 0.096*t

MCD (e)Service speed: 80000 rpmWeight: 700 gramsBalance quality: G0.4MCD (e) µm = 9549 G/nMCD (e) µm = 9549 x 0.4/80000 = 0 . 048 µmSo Perm

Pagina 17 - 0.04*Vsp

ELECTRICAL SYSTEM CONNECTOR (RM215TR-10SC) Connector would be: RM215TR-10SC MOTOR FUNCTION WIRE COLOR PIN Motor A Red 1 Motor B White 2

Pagina 18

THERMISTOR “Thermistor” is the generic name given to thermally sensitive resistors. Negative temperature coefficient thermistor is generally called a

Pagina 19 - SPINDLE MODES

Description of a Spindle Testing. Introduction: After connecting the spindle to the computerized testing system (air, electricity, control etc.), it w

Pagina 20 - SPINDLE BALANCIN

COOLING WATER SEALING & FLOW TEST CIRCUIT E air flow meterC electric valve shuttle

Pagina 21

FAILURE – CAUSE - PREVENTION Failure Cause Prevention The shaft doesn’t rotate freely. - There is dirt or oil in bearing gap - Low air pressur

Pagina 23

Characteristics In most respects aerostatic bearings are ideally suited for use in high-speed machines. Their low friction provides hi

Pagina 25 - 203GT-1

CONTENTS 1. Fundamental Safety Instructions. 3 2. Warranty notice. 5 3. Attention – Daily Check Before starting the spindle 6 4. Sy

Pagina 26 - Introduction:

FUNDAMENTAL SAFETY INSTRUCTIONS 1. Basic operation and designated use of the machine. 1.1 The machine has been built in accordance with state of the

Pagina 27 - FLOW TEST CIRCUIT

3.5 Do not allow persons to be trained or instructed or persons taking part in a general training course to work on or with the machine without being

Pagina 28 - Failure Cause Prevention

6.2 Work on the electrical system or equipment may only be carried out by a skilled electrician himself or by specially instructed personnel under th

Pagina 29

ATTENTION DAILY CHECK BEFORE OPERATING THE SPINDLE 1. For first time installation, look at “I

Pagina 30

SYSTEM GENERAL DESCRIPTION TOP VIEW SIDE VIEW

Comentarios a estos manuales

Sin comentarios